Skip to main content

Document library

If you are having difficulty locating a document, please email us at sydneymetro@transport.nsw.gov.au or call our 24 hour community information line on 1800 171 386.

type to filter the content below. There is no need to click the search button
Document type

Document library

Showing 270 out of 1546 results

Download Consistency Assessment: Hunter Street Station East temporary decline

Consistency Assessment: Hunter Street Station East temporary decline

Project: West

|

Date:

 
Download Victoria Cross Interchange Access Plan February 2023

Victoria Cross Interchange Access Plan February 2023

Project: City & Southwest

|

Date:

 
Download Sydney Metro - Western Sydney Airport St Mary's SSTOM Project Office DNVIS - Built

Sydney Metro - Western Sydney Airport St Mary's SSTOM Project Office DNVIS - Built

Project: Western Sydney Airport line

|

Date:

 
Download Site Establishment Management Plan, SSTOM Project Office (SPO) Building at St Marys WSA - Stage 2 Design and Construct Sydney Metro

Site Establishment Management Plan, SSTOM Project Office (SPO) Building at St Marys WSA - Stage 2 Design and Construct Sydney Metro

Project: Western Sydney Airport line

|

Date:

 
Download Consistency Assessment: Water Treatment Discharge into Duck River

Consistency Assessment: Water Treatment Discharge into Duck River

Project: West

|

Date:

 
Download Noise and Vibration Consistency Assessment: Pyrmont Crossover Cavern

Noise and Vibration Consistency Assessment: Pyrmont Crossover Cavern

Project: West

|

Date:

 
Download City & Southwest Environmental Representative ER Monthly Report: January 2023

City & Southwest Environmental Representative ER Monthly Report: January 2023

Project: City & Southwest

|

Date:

 
Download Sydney Metro West Acoustic Advisor Monthly Report - January 2023

Sydney Metro West Acoustic Advisor Monthly Report - January 2023

Project: West

|

Date:

 
Download Consistency Assessment: Relocation of a crossover cavern to Pyrmont and tunnel alignment optimisation

Consistency Assessment: Relocation of a crossover cavern to Pyrmont and tunnel alignment optimisation

Project: West

|

Date:

 
Download Aboriginal Participation Case Study - February 2023

Aboriginal Participation Case Study - February 2023

Date:

 
Back to top