Skip to main content

Document library

If you are having difficulty locating a document, please email us at sydneymetro@transport.nsw.gov.au or call our 24 hour community information line on 1800 171 386.

type to filter the content below. There is no need to click the search button
Document type

Document library

Showing 720 out of 1649 results

Download Environmental Representative ER Monthly Report - January 2021

Environmental Representative ER Monthly Report - January 2021

Project: City & Southwest

|

Date:

 
Download City & Southwest Construction Compliance Report #7 - Apr 2020 to Sept 2020

City & Southwest Construction Compliance Report #7 - Apr 2020 to Sept 2020

Project: City & Southwest

|

Date:

 
Download External photographs of demolished building and structures

External photographs of demolished building and structures

Project: City & Southwest

|

Date:

These images are available from the respective local council or alternatively contact Sydney Metro to request a copy.

 

Download Consistency Assessment - Radio Masts along the Sydenham to Bankstown corridor

Consistency Assessment - Radio Masts along the Sydenham to Bankstown corridor

Project: City & Southwest

|

Date:

 
Download Consistency Assessment: Cooling water supply to Barangaroo Station

Consistency Assessment: Cooling water supply to Barangaroo Station

Project: City & Southwest

|

Date:

 
Download Consistency Assessment - Radio Mast at Sydenham

Consistency Assessment - Radio Mast at Sydenham

Project: City & Southwest

|

Date:

 
Download Sydney Metro Sustainability Framework

Sydney Metro Sustainability Framework

Date:

 
Download Environmental Representative ER Monthly Report - December 2020

Environmental Representative ER Monthly Report - December 2020

Project: City & Southwest

|

Date:

 
Download City & Southwest Acoustic Advisor Monthly Report - December 2020

City & Southwest Acoustic Advisor Monthly Report - December 2020

Project: City & Southwest

|

Date:

 
Download SYDNEY METRO City and Southwest - Chatswood to Sydenham - Track Attenuation and Operational Ground-borne Noise Review (Condition D9) – report 1

SYDNEY METRO City and Southwest - Chatswood to Sydenham - Track Attenuation and Operational Ground-borne Noise Review (Condition D9) – report 1

Project: City & Southwest

|

Date:

 
Back to top