Skip to main content

Document library

If you are having difficulty locating a document, please email us at sydneymetro@transport.nsw.gov.au or call our 24 hour community information line on 1800 171 386.

type to filter the content below. There is no need to click the search button
Document type

Document library

Showing 430 out of 1648 results

Download Consistency Assessment: Defence Establishment Orchard Hills Detention Basin

Consistency Assessment: Defence Establishment Orchard Hills Detention Basin

Project: Western Sydney Airport line

|

Date:

 
Download Sydney Metro — Western Sydney Airport September 2022 ER Monthly Report

Sydney Metro — Western Sydney Airport September 2022 ER Monthly Report

Project: Western Sydney Airport line

|

Date:

 
Download Sydney Metro - Western Sydney Airport - ER Report: October 2022

Sydney Metro - Western Sydney Airport - ER Report: October 2022

Project: Western Sydney Airport line

|

Date:

 
Download Sydney Metro West Design Excellence Strategy

Sydney Metro West Design Excellence Strategy

Project: West

|

Date:

 
Download Consistency Assessment: Hunter Street station undercut and turnback tunnels

Consistency Assessment: Hunter Street station undercut and turnback tunnels

Project: West

|

Date:

 
Download Consistency Assessment: Revised footprint on lands to the north of Elizabeth Drive

Consistency Assessment: Revised footprint on lands to the north of Elizabeth Drive

Project: Western Sydney Airport line

|

Date:

 
Download Sydney Metro – Western Sydney Airport Quarterly newsletter

Sydney Metro – Western Sydney Airport Quarterly newsletter

Project: Western Sydney Airport line

|

Date:

 
Download Consistency Assessment: Chatswood Station rail possession October 2022

Consistency Assessment: Chatswood Station rail possession October 2022

Project: City & Southwest

|

Date:

 
Download Consistency Assessment: Removal of Punchbowl lamp room to support underpass and removal of Punchbowl Road signalised mid-block crossing

Consistency Assessment: Removal of Punchbowl lamp room to support underpass and removal of Punchbowl Road signalised mid-block crossing

Project: City & Southwest

|

Date:

 
Download Buchanan Precast Facility Determination Report for Review of Environmental Factors (REF)

Buchanan Precast Facility Determination Report for Review of Environmental Factors (REF)

Project: Western Sydney Airport line

|

Date:

 
Back to top