Skip to main content

Document library

If you are having difficulty locating a document, please email us at sydneymetro@transport.nsw.gov.au or call our 24 hour community information line on 1800 171 386.

type to filter the content below. There is no need to click the search button
Document type

Document library

Showing 240 out of 1648 results

Download City & Southwest Acoustic Advisor Monthly Report: November 2023

City & Southwest Acoustic Advisor Monthly Report: November 2023

Project: City & Southwest

|

Date:

 
Download City & Southwest Construction Compliance Report No.13 - April 2023 to September 2023

City & Southwest Construction Compliance Report No.13 - April 2023 to September 2023

Project: City & Southwest

|

Date:

 
Download Temporary Transport Management Plan - December 2023 to January 2024 shutdown

Temporary Transport Management Plan - December 2023 to January 2024 shutdown

Project: City & Southwest

|

Date:

 
Download Crows Nest Station Interchange Access Plan

Crows Nest Station Interchange Access Plan

Project: City & Southwest

|

Date:

 
Download Sydney Metro West D51 Outcomes of Community Consultation Report - 2023 Q3

Sydney Metro West D51 Outcomes of Community Consultation Report - 2023 Q3

Project: West

|

Date:

 
Download Consistency Assessment - Replacement of Victoria Cross mid-block signalised crossing with upgrade to existing crossing at Pacific Highway/Miller Street

Consistency Assessment - Replacement of Victoria Cross mid-block signalised crossing with upgrade to existing crossing at Pacific Highway/Miller Street

Project: City & Southwest

|

Date:

 
Download Sydney Metro West D37 Outcomes of Community Consultation Report March - September 2023

Sydney Metro West D37 Outcomes of Community Consultation Report March - September 2023

Project: West

|

Date:

 
Download Sydney Metro West Consistency Assessment - Pyrmont East - Temporary Shaft Excavation

Sydney Metro West Consistency Assessment - Pyrmont East - Temporary Shaft Excavation

Project: West

|

Date:

 
Download Consistency Assessment - Staged opening of the southern station entry at Barangaroo Station and extended use of the Water Treatment Plant

Consistency Assessment - Staged opening of the southern station entry at Barangaroo Station and extended use of the Water Treatment Plant

Project: City & Southwest

|

Date:

 
Download Sydney Metro - Western Sydney Airport September 2023 ER Monthly Report

Sydney Metro - Western Sydney Airport September 2023 ER Monthly Report

Project: Western Sydney Airport line

|

Date:

 
Back to top