Skip to main content

Document library

If you are having difficulty locating a document, please email us at sydneymetro@transport.nsw.gov.au or call our 24 hour community information line on 1800 171 386.

type to filter the content below. There is no need to click the search button
Document type

Document library

Showing 310 out of 1648 results

Download Sydney Metro WSA Independent Audit No.3 - SM Response

Sydney Metro WSA Independent Audit No.3 - SM Response

Project: Western Sydney Airport line

|

Date:

 
Download Sydney Metro West Acoustic Advisor Monthly Report – May 2023

Sydney Metro West Acoustic Advisor Monthly Report – May 2023

Project: West

|

Date:

 
Download Sydney Metro West Environmental Representative Monthly Report – May 2023

Sydney Metro West Environmental Representative Monthly Report – May 2023

Project: West

|

Date:

 
Download Sydney Metro West Acoustic Advisor Monthly Report – June 2023

Sydney Metro West Acoustic Advisor Monthly Report – June 2023

Project: West

|

Date:

 
Download Sydney Metro West Environmental Representative Report – June 2023

Sydney Metro West Environmental Representative Report – June 2023

Project: West

|

Date:

 
Download Sydney Metro Second Addendum Review of Environmental Factors (REF) - Buchanan Pre-cast Facility

Sydney Metro Second Addendum Review of Environmental Factors (REF) - Buchanan Pre-cast Facility

Project: Western Sydney Airport line

|

Date:

 
Download DPE Revised Direction - CPBG Response to Revised Direction

DPE Revised Direction - CPBG Response to Revised Direction

Project: Western Sydney Airport line

|

Date:

 
Download DPE Revised Direction - CPBG Detailed Response to SEEC Audit Report

DPE Revised Direction - CPBG Detailed Response to SEEC Audit Report

Project: Western Sydney Airport line

|

Date:

 
Download DPE Revised Direction - Sydney Metro WSA SEEC Audit Report of the Erosion and Sediment Control

DPE Revised Direction - Sydney Metro WSA SEEC Audit Report of the Erosion and Sediment Control

Project: Western Sydney Airport line

|

Date:

 
Download DPE Revised Direction - Erosion Sediment Control Condition A5

DPE Revised Direction - Erosion Sediment Control Condition A5

Project: Western Sydney Airport line

|

Date:

 
Back to top