On track high above Windsor Road
04.04.2018
The track laying process has started on the landmark new railway bridge over Windsor Road at Rouse Hill.
The deck of the landmark cable-stayed bridge, similar in design to Sydney’s Anzac Bridge, is being prepared for railway tracks with steel being installed so the concrete track slab can be laid.
Then will come 540m of new railway tracks on the bridge.
Already, more than 7km of railway tracks have been installed on the skytrain between Rouse Hill and Bella Vista.