Skip to main content

Barangaroo Station update

01.10.2021

Barangaroo Cavern Plenum
Barangaroo Cavern
Barangaroo Cavern Plenum
Barangaroo Cavern Plenum
Barangaroo Cavern

Barangaroo Station is now ready for platforms, lifts and escalators following two years of excavation to a 30-metre depth.

The tunnel builder John Holland CPB Ghella has handed over the excavated Barangaroo Station box to the next contractor, BESIX Watpac, to build the station.

About 650,000 tonnes of crushed rock – enough to fill 100 Olympic swimming pools – was excavated for the station and the adjacent crossover cavern, where trains will be able to swap tracks underground.

Barangaroo Station construction

Construction update

Back to top